March - April 2013
Aft Module 2 (Engine Room 2) near completion.
Forward Module 2 (Engine Room 1) being assembled (left side of picture).
Forward Module 2 (Engine Room 1) near completion.
Interior of Engine Room 1.
Keel for aft module 3 being set in place. This is where the keel starts to rise up toward the stern of the ship.
Forward Module 3 being assembled. These modules will house the drive units (Propeller Systems)
One of the drive beds fitted on the vessel. This complex steel structure will be the seating for one of two Voith Schneider Propeller units.
This view shows the preparation of the beach for the launch of the vessel. By mid-summer when the lake level rises the truck in the foreground would be submerged in water. The vessel will be launched side-ways during the high water period this summer.